]> pilppa.com Git - linux-2.6-omap-h63xx.git/commit
sched: fix __pick_next_entity()
authorDmitry Adamushko <dmitry.adamushko@gmail.com>
Mon, 15 Oct 2007 15:00:13 +0000 (17:00 +0200)
committerIngo Molnar <mingo@elte.hu>
Mon, 15 Oct 2007 15:00:13 +0000 (17:00 +0200)
commit08ec3df5109e0555da5b9deb4382fd29733c852c
tree4739cd8a9b37b9d5482f88db3c8cdc78b07a8a98
parent647e7cac2d215fb8890f79252d7eaee3d6743d66
sched: fix __pick_next_entity()

The thing is that __pick_next_entity() must never be called when
first_fair(cfs_rq) == NULL. It wouldn't be a problem, should 'run_node'
be the very first field of 'struct sched_entity' (and it's the second).

The 'nr_running != 0' check is _not_ enough, due to the fact that
'current' is not within the tree. Generic paths are ok (e.g. schedule()
as put_prev_task() is called previously)... I'm more worried about e.g.
migration_call() -> CPU_DEAD_FROZEN -> migrate_dead_tasks()... if
'current' == rq->idle, no problems.. if it's one of the SCHED_NORMAL
tasks (or imagine, some other use-cases in the future -- i.e. we should
not make outer world dependent on internal details of sched_fair class)
-- it may be "Houston, we've got a problem" case.

it's +16 bytes to the ".text". Another variant is to make 'run_node' the
first data member of 'struct sched_entity' but an additional check (se !
= NULL) is still needed in pick_next_entity().

Signed-off-by: Dmitry Adamushko <dmitry.adamushko@gmail.com>
Signed-off-by: Ingo Molnar <mingo@elte.hu>
Reviewed-by: Thomas Gleixner <tglx@linutronix.de>
kernel/sched_fair.c